Jeff (VA3ISP) let me know that he would be available to climb my tower at 11am on Monday, June 9 and I should get ready and line up some helpers. I was fortunate enough to get the help of 2 good friends: Ying (VA3YH) and Jim (VA3KV), who made themselves available on short notice.
I am particularly grateful for the help of these guys because on Sunday, I managed to pull my back while starting my chainsaw. As a result I was not quite as mobile as I would have liked.
Ying and I had pre-tested a new TV antenna, a Ubiquity M2 module and a Ubiquity M5 module on a short mast near my tower. Once it is up on the tower, a device is a lot harder to replace or modify, so the more that can be pre-tested, the better.
I also made sure that I had a cable to replace the feed line around the tower bearing, in case that was the problem. There is no time for fooling around building cables, etc. when a climber is standing on a tower, so all this must be ready ahead of time.
First thing Monday morning, I lowered all possible feedlines and antennas that were on the tower, to ensure that Jeff would not have too much stuff in his way during the climb. I also cleared the area around the base of tower of obstacles.
Jim and Ying arrived at about 11am and Jeff pulled in shortly later. The weather was perfect, about 20C and sunny, with an occasional breeze to keep the mosquitoes away. The pictures tell much of the story.
My Radio Tower
Close-Up of the Antennas
L-to-R Jeff VA3ISP, Jim VA3KV, Ying VA3YH
Jeff Going Up
Jeff is Near the Top
Getting Strapped In
Close-Up of the Rotor
Attaching the M2 Module
M2 in Place
TV Antenna is in Place at the Top
Mounting the M5 unit
Close-Up of the M5
After the climb, we re-grouped at Broadway's Restaurant in Rockland for a light lunch. It was an excellent day.
No comments:
Post a Comment